Hollier Construction Services, a third-generation, family-owned concrete contractor based in Beaumont, builds concrete curb and gutter in Vidor, TX. We serve developers, builders, businesses on I-10 and FM 105, and owners replacing failed sections. Barrier curb, roll curb, and valley gutter are machine-laid. Hand-form crews add radii, driveway transitions, and ADA curb ramps, all built to the TxDOT and City of Vidor specifications on the plans.
Vidor is an Orange County city on Interstate 10. The 2020 census counted 9,789 residents on about 12 square miles of land. Hollier Construction Services is based in Beaumont and works across Orange County daily. We build concrete curb and gutter for new residential streets, commercial frontage, parking areas, and replacement sections on older blocks.
Interstate 10 and FM 105 meet in Vidor, where FM 105 serves as Main Street. TxDOT's highway designation file runs FM 105 south from U.S. 96 through Evadale and Vidor, then east through Orangefield. State Highway 12 also branches northeast from I-10 in Vidor toward Mauriceville. The Orange Leader reported an I-10 widening from four lanes to six, from the Kansas City railroad tracks near Vidor east to FM 1442. 12News has covered new truck stops going up along I-10 between Beaumont and Orange. Vidor's city manager said the city had annexed land where one of them was being built. In 2023, 12News also reported a planned subdivision off Tram Road with five phases and several cul-de-sacs. Commercial frontage on these routes has to meet the highway and the private site at the approved driveway geometry.
Drainage drives the design of every Vidor curb line. In 2020, the Texas General Land Office approved Hurricane Harvey recovery funds for Vidor streets and drainage. The list included storm sewer culverts and outfall ditches on Elgie Street and Orange Street. It also covered street work on North Archie Street and a replacement bridge on Alamo Street. The same grant paid for a planning study of Anderson Gully, which was inundated during Harvey. New concrete curb and gutter has to hand its water to that system at the right elevation. A flow line set too flat leaves water standing against the curb after a storm. Where new curb meets an existing ditch or culvert, the transition needs a defined path so water is not trapped behind fresh concrete.
Responsibility for streets is split. Inside city limits, the Vidor Street Department maintains and rebuilds city streets and rights-of-way. Its crews also pull shoulders so water does not stand on the road. The city's Drainage Department establishes elevations, rebuilds city drainage systems, and issues culvert permits. It also inspects culverts that owners or contractors install, checking installation and grade. Across the wider county, KFDM reported that the Orange County Drainage District is responsible for hundreds of miles of ditches. I-10 and FM 105 are TxDOT highways, so a new driveway onto either one needs a TxDOT permit.
Our slip-form machine lays barrier curb, roll curb, and valley gutter at several hundred linear feet per day in typical conditions. Hand-form crews then build the radii, driveway transitions, curb repairs, and ADA curb ramps that a machine cannot. Before any concrete goes down, the subgrade should be graded, compacted, and checked against plan elevations. Land clearing, soil stabilization, site preparation, concrete paving, and sidewalks are also Hollier's own work. On a Vidor tract, that means one contractor from cleared ground to finished street.
Inside the city limits, the Vidor Street Department is responsible for maintaining and reconstructing city streets and rights-of-way. Interstate 10 and FM 105 are TxDOT highways, so work in their right-of-way goes through TxDOT. If your lot sits outside the city, ask Orange County Road & Bridge which office covers your road.
If the driveway crosses a city drainage ditch, ask the city about a culvert permit first. The City of Vidor Drainage Department issues culvert permits. It also inspects culverts installed by owners or contractors to confirm they were set at the proper grade.
The applicant contacts the local TxDOT district office and submits Form 1058, the Permit to Construct Access Driveway Facilities on Highway Right of Way. No work in the right-of-way may begin until that permit is fully executed and TxDOT has 24 hours of notice. A TxDOT inspector then reviews the construction and can call for changes.
Anderson Gully was inundated during Harvey, and state recovery money paid for a planning study of the gully. The same General Land Office grant covered storm sewer culverts, outfall ditches, and several street segments. New curb in Vidor should be set so runoff enters that rebuilt system cleanly.
It can, but only with an engineered design. A curbed street needs inlets and storm pipe to carry the water a roadside ditch carries now. We build the curb, gutter, and paving to the approved plans and the City of Vidor specifications that apply.
Concrete should not go onto standing water or a saturated subgrade, so a wet stretch can move the pour date. Fresh curb also needs protection from a hard rain until it sets. Machine-laid runs move quickly once the base is ready, which helps fit curb work between storms.
Yes. Hollier self-performs land clearing, soil stabilization, site preparation, concrete paving, sidewalks, and flatwork along with the curb. Keeping the full concrete package with one contractor puts the whole schedule in one set of hands.
U.S. Census Bureau: QuickFacts, Vidor city, Texas
City of Vidor: Streets - Drainage - Parks
TxDOT: Highway Designation File, Farm to Market Road No. 105
Orange Leader: TxDOT updates Orange County road work
AARoads: Interstate 10 East - Orange County
12News: New truck stops along I-10 corridor set to boost economy in Southeast Texas
12News: Developers planning to turn empty Vidor lot into brand-new subdivision
KFDM via KTXS: Orange County Drainage District repairing ditches while it waits for adequate funding