Hollier Construction Services builds parking lot curb and landscape islands for commercial owners, property managers, and general contractors across Southeast Texas. Work covers barrier and roll curb, curb radii at island ends, and curb ramps along accessible routes. Hollier also self-performs concrete paving and site preparation, so base, curb, and pavement can come from one contractor on one schedule.
Every curb in a lot has a job. The wrong profile leads to scuffed tires, trip hazards, or water that never reaches a drain.
Most lots mix profiles. Each edge gets the curb that suits the traffic and runoff it must handle.
In a paved lot, curb is a drainage structure. It holds runoff on the pavement and steers it toward the inlets, flumes, or detention areas on the civil plans.
Islands need an early decision. A raised planter with full-height curb sheds water around itself. A depressed island with curb openings lets runoff flow into the planting bed. The grading plan must agree with whichever design the owner picks.
Flow lines have to hit plan grades. A small miss at a curb return can leave a pond across the main entrance. Where curb borders concrete paving, TxDOT Item 529 calls for curb joints of the same type and location as the pavement joints. Expansion joints extend through the curb.
Most lot repairs and expansions happen while the store, office, or clinic stays open. A phasing plan keeps entrances, accessible stalls, and fire lanes usable while curb is replaced zone by zone.
Street-side work has extra steps. Beaumont requires a permit for any construction in the public right-of-way. A driveway also needs a pre-pour inspection, scheduled through 311, once forms and reinforcement are set. Closing a street lane to build an entrance takes a separate Street Cut and Barricading permit.
Curb usually goes in before the pavement it borders. On a concrete lot, curb is either poured integral with the paving or placed first as a separate pour. Item 529 requires monolithic curb to use the same class of concrete as the pavement. On an asphalt lot, curb is set first so the paving crew has a fixed edge.
Hollier self-performs concrete paving, sidewalks, soil stabilization, and site preparation along with curb and gutter. One contractor can sequence subgrade, curb, and pavement without waiting on another trade to mobilize.
Striping comes last, but it should be planned first. Curb noses, island ends, and fire lane curb are often painted. Agree on the striping layout before curb is staked so stall widths and access aisles land where the paint plan expects. An advisory in the 2010 ADA Standards favors marked crossings where the accessible route must cross vehicle lanes.
Accessible stalls and the walking route to the entrance must work together. Section 206.2.1 of the 2010 ADA Standards requires at least one accessible route from accessible parking to the entrance it serves. Section 502.3 requires each access aisle to adjoin an accessible route.
Grades matter on both sides of the curb. Section 502.4 allows parking spaces and access aisles no slope steeper than 1:48. Where the route crosses a curb, the Access Board's guide says a change in level over 1/2 inch needs a ramp or curb ramp.
Placement matters as much as slope. TAS 406.5 keeps curb ramps and their flared sides out of vehicle lanes, parking spaces, and parking access aisles. The advisory to Section 502.4 explains that built-up curb ramps there would create slopes greater than 1:48.
A curb ramp on an accessible route follows the ramp limits in TAS 405, including a running slope no steeper than 1:12. Outside transit facilities, the Access Board's guide says the 2010 ADA Standards do not require domes on curb ramps. The approved drawings decide whether domes are included. Hollier's hand-form crews build these ramps along with the surrounding curb. Questions go to (409) 718-5701, weekdays 9 AM to 5 PM.
Use barrier curb where vehicles must stay off walks, planters, and building fronts. Use mountable curb where trucks, trailers, or fire apparatus need to cross. Most commercial lots use both, chosen edge by edge.
Poured curb at the head of stalls cannot be pushed out of line the way loose precast stops can. It also gives runoff a clean edge to follow. Wheel stops still make sense where a lot must stay flush for drainage or foot traffic.
Yes, with a phased plan. The lot is split into zones so entrances, accessible stalls, and fire lanes stay usable during each phase. New concrete stays barricaded until it can take traffic.
A raised island with full curb pushes water around it toward the inlets. A depressed island with curb openings lets runoff soak into the planting bed. The civil grading plan should show which approach applies before forms are set.
The Access Board's guide says the 2010 ADA Standards call for detectable warnings on curb ramps only at transit facilities covered by DOT's standards. A typical private lot falls outside that rule, but local plans or other standards may still call for domes. Follow the approved drawings and ask the designer when the plans are unclear.
Curb normally goes first, or is poured integral with concrete paving, so the pavement has a fixed edge and grade to meet. Using one contractor for both makes that sequence easier to hold. Hollier self-performs curb, paving, and site preparation.
The Texas Accessibility Standards keep curb ramps and their flares out of vehicle lanes, parking spaces, and parking access aisles. Access aisles must stay nearly level so people can transfer to and from vehicles. The ramp belongs on the walkway side of the curb.
Section 208.3.1 of the 2010 ADA Standards places accessible spaces serving a building on the shortest accessible route to an accessible entrance. Where parking serves more than one accessible entrance, the spaces are dispersed among those entrances. Curb, ramps, and striping should be laid out to match.
TxDOT: 2024 Standard Specifications, Item 529 Concrete Curb, Gutter, and Combined Curb and Gutter
ADA.gov: 2010 ADA Standards for Accessible Design
U.S. Access Board: Guide to the ADA Accessibility Standards, Chapter 4: Ramps and Curb Ramps
TDLR: TAS Chapter 4: Accessible Routes
City of Beaumont: Driveway Construction and Maintenance (Driveway Permit Information PDF)
City of Beaumont: Frequently Asked Questions, Public Works (Engineering)