Concrete Curb & Gutter Contractor in Lumberton, TX

Hollier Construction Services is a family-owned concrete contractor from Beaumont that installs concrete curb and gutter in Lumberton, TX. Our crews work in Hardin County daily and build for subdivision streets off FM 421, commercial sites along U.S. 69, and curb replacement on city blocks. We also self-perform clearing, soil stabilization, and paving, all built to the TxDOT and City of Lumberton specifications on the plans.

Lumberton is a growing Hardin County city. The 2020 census counted 13,554 residents, up from 11,943 in 2010, and the Census Bureau's July 2025 estimate is 14,123. A major planned development sits on FM 421 West. In 2019, KTXS reported that the Lumberton Municipal Utility District signed an agreement with the owner of a 3,200-acre tract there. The agreement provides infrastructure financing backed by tax bonds collected within that area. The owner plans phased residential and commercial development with open space and green belts. On the retail side, 12News reported in 2022 that a shopping center was planned off Highway 69 just south of Lumberton High School.

New subdivision streets become city streets by council vote. At one August 2023 meeting, the City Council accepted the streets and drainage facilities of four new subdivision sections. Rules for streets, sidewalks, driveways, and other public places sit in Chapter 40 of the Lumberton Code of Ordinances. In November 2023, the council also passed on first reading a change to the minor plat rules in Chapter 42. It would require a drainage study and drainage appurtenances approved by the city engineer. The Lumberton Municipal Utility District provides retail water and sewer service in the area. Utility crossings should be in and backfilled before curb lines are set.

The highway network has changed as well. In 2019, KFDM reported a TxDOT contract to widen U.S. 69 from the U.S. 69/96 split to FM 421. The project was to take the highway from one lane in each direction to two. TxDOT's Beaumont District is now proposing a U.S. 69 relief route from Cooks Lake Road, south of Lumberton, to FM 420 north of Kountze. Its goals include an alternate evacuation route for the growing population of Hardin and nearby counties. TxDOT estimates phased construction could begin in 2036, as funding allows.

Flooding is the main design constraint. A Hardin County commissioner told 12News that much of Lumberton drains to Bogee Creek through construction done decades ago. She added that recent growth has compounded the problem. She spoke as the county approved the first phase of a development across from the city park on FM 421. She said typical rules call for detaining runoff from a 25-year storm, and the developer hoped to beat that. In late 2024, heavy rain flooded Lumberton neighborhoods and the city park. County Judge Wayne McDaniel then told 12News that Lumberton needs a drainage district. A 2025 Hardin County notice lists concrete channel lining on Adler Ditch, between U.S. 69 and FM 421.

All of that puts weight on the gutter flow line. Our slip-form machine places roll curb, barrier curb, and valley gutter to engineered grades, several hundred linear feet a day in typical conditions. Hand-form crews finish cul-de-sac radii, driveway transitions, and ADA curb ramps. Hollier Construction Services runs those crews out of Beaumont and works in Hardin County daily. We also clear land, stabilize soil, and pour paving and sidewalks, so a Lumberton developer can keep the concrete package with one contractor.

Who takes over the streets in a new Lumberton subdivision?

The Lumberton City Council votes to accept the streets and drainage facilities in new subdivision sections. At one August 2023 meeting, it accepted four of them. Curb built to the approved plans and city specifications helps that acceptance step go smoothly. If you are unsure whether your street has been accepted, ask the city.

Does Lumberton require a sidewalk along new curb?

Not on every lot. In November 2023, the City Council approved the first reading of Ordinance 23-1278. It would amend Chapter 40 of the city code to provide for a city sidewalk map. The city attorney said sidewalks cannot be required on every property, so check the current map with the city before you budget your frontage.

Where are Lumberton's rules for driveways and curb cuts on city streets?

Chapter 40 of the Lumberton Code of Ordinances covers streets, sidewalks, driveways, and other public places. Read it, or call the city, before anyone saw-cuts an existing curb. Our hand-form crews then build the driveway transition to the profile the city calls for.

Does a small plat in Lumberton need a drainage study?

It may. In November 2023, the council passed on first reading Ordinance 23-1277, which would amend the minor plat section of Chapter 42. It would require a drainage study and drainage appurtenances approved by the city engineer. Confirm the current rule with the city before you set curb grades on a small tract.

What permit covers a driveway onto U.S. 69 or U.S. 96 in Lumberton?

Highway frontage is TxDOT right-of-way. The applicant files Form 1058 with TxDOT, waits for the fully executed permit, and then gives the agency a day of notice before starting. A TxDOT inspector looks over the driveway construction afterward.

Will new curb fix flooding on my Lumberton street?

Curb alone will not. A county commissioner has said much of Lumberton drains to Bogee Creek through construction done decades ago. The gutter has to work with the inlets, pipe, and ditches downstream. New curb should follow the engineer's drainage design for the whole street, not just your frontage.

What is the proposed U.S. 69 relief route?

TxDOT's Beaumont District is proposing a new U.S. 69 relief route in Hardin County. It would run from Cooks Lake Road, south of Lumberton, to FM 420 north of Kountze, with frontage roads in each direction. TxDOT's estimated timeline puts a public hearing in 2030 and phased construction around 2036.

When does curb go in on a new Lumberton subdivision phase?

Curb follows clearing, underground utilities, and subgrade preparation, and it comes before the street paving. A wet subgrade that ruts under loaded trucks has to dry out or be stabilized first. Hollier self-performs soil stabilization, site preparation, curb, and paving, so those steps stay on one schedule.

Nearby Service Areas

Curb Work by Type

U.S. Census Bureau: QuickFacts, Lumberton city, Texas

KTXS: New Lumberton develop planned; to include open spaces and green belt areas off FM 421 West

12News: Houston-based real estate company planning to bring new shopping center, restaurants to Lumberton

City of Lumberton: Minutes of August 28, 2023, City Council meeting

City of Lumberton: Minutes of November 27, 2023, City Council meeting

Public Utility Commission of Texas: Docket No. 52132, Application of Lumberton Municipal Utility District to amend its certificates of convenience and necessity in Hardin County, Notice of Approval

KFDM via KTXS: TxDOT approves funding to widen US 69 in Lumberton

TxDOT: US 69 Lumberton-Kountze project

12News: City of Lumberton searches for solutions after heavy flooding throughout the year

12News: Lumberton housing development project receives approval, draws concern from residents

Hardin County: Early Notice and Public Review of a Proposed Activity in a Floodplain and Wetland (MIT MOD Drainage-Lumberton)

TxDOT Access Management Manual: Permits