Hollier Construction Services installs machine-laid concrete curb and gutter in Groves, TX for street rebuilds, commercial lots, and residential frontage. The family-owned Beaumont contractor also hand-forms radii, driveway transitions, curb repairs, and ADA curb ramps. Work is built to the TxDOT and City of Groves specifications on the plans. Flow lines are set for the city's flat, low terrain.
Groves covers 5.18 square miles of land in south Jefferson County. The 2020 census counted 17,335 residents, up from 16,144 in 2010. The Census Bureau's estimate for July 1, 2025 is 16,907. Texas 73 and Texas 347 both meet the city's street grid, at roads such as Howe Street and Woodlawn Avenue. Curb or driveway work along a state highway should be cleared with TxDOT as well as the city.
Groves rebuilds its worn streets in phases. The 2020 program covered more than four miles of road, starting with the worst one, Monroe Street. That busy stretch, nearly a mile from Twin City Highway to Main Avenue, was rebuilt from the bottom up. After rock went down, a reclaimer was set to form a new base. The plan called for a seal coat the first year and asphalt the next. Under an interlocal agreement, Jefferson County Precinct 2 lays the rock once city crews finish the prep work. The council also hired Action Civil Engineers for street work funded by a Texas General Land Office grant tied to Hurricane Harvey. That program covered 26,912 feet of storm-damaged road. Weather can change the surface, too. Oak Avenue was slated for chip seal, which needs temperatures above 80 degrees, so a cold spell pushed the city to asphalt. A street rebuild is a good moment to replace sunken or broken curb, so the new surface sheds water to a true line.
Storm water in Groves leaves through Jefferson County Drainage District No. 7, which also serves Port Arthur, Nederland, and Port Neches. DD7 says two-thirds of the district lies below five feet above sea level. It has two Groves detention ponds in design. One would add about 39 acres of storage along Taft Avenue at State Highway 73 for parts of Groves and Port Arthur. The A3A pond would add about 29 acres on Hogaboom Road near the soccer fields. Groves also lies inside the Port Arthur and Vicinity Hurricane Protection System, which DD7 serves as a local sponsor.
Harvey showed how little relief this ground gives. A Texas Water Science Center specialist described the area as flat and close to sea level. By the evening of Aug. 29, 2017, rescues had started in Port Arthur and Groves. On ground that flat, the gutter flow line carries real weight. Hollier builds every run to the grades and specifications on the plans, so runoff reaches the inlet instead of standing against the curb. Long runs of barrier curb, roll curb, or valley gutter go to the company's own slip-form machine. Hand-form crews take the driveway transitions, curb repairs, and ADA ramps at street corners.
Groves keeps its street rules in Chapter 22, Streets and Sidewalks, of the city code published on Municode. Flood damage prevention rules sit in Chapter 10½. That online copy is codified through Ordinance No. 2025-21, enacted November 10, 2025. Confirm permits with the city before any curb is cut or the right-of-way is opened. Hollier also self-performs paving, sidewalks, flatwork, soil stabilization, and site preparation. That lets a Groves owner keep the subgrade, curb, and slab behind it on one schedule with one contractor.
Start with the City of Groves, which runs its own street program with help from Jefferson County Precinct 2. Texas 73 and Texas 347 are state highways, so check with TxDOT for curb along them. Ask the city whether a repair is already planned in a street project before hiring anyone.
Check with the city first. Groves publishes its street rules in Chapter 22 of its code of ordinances, titled Streets and Sidewalks. If the lot fronts a state highway, contact TxDOT too. We build the curb cut and approach to whatever the approved plan shows.
Groves is low and flat, and DD7 reports that two-thirds of its district sits below five feet above sea level. There is very little fall between a driveway and the nearest inlet. We string-line and verify grade before the machine runs, so water moves to the storm pipe instead of ponding.
Yes. When the city rebuilds a street, as on Monroe Street in 2020, curb often must be reset to the new base and surface. We work to the paving schedule so curb is placed and cured before the final surface goes down.
We track the forecast and avoid placing curb ahead of heavy Gulf weather. If a shower arrives after a pour, crews cover the fresh concrete to protect the finish. Subgrade that gets soaked is reworked and recompacted before the machine runs again.
Old curb often sits on base that has softened or washed out over time. We dig out failed material, compact the base, and stabilize it where the plans require. Because Hollier self-performs soil stabilization and site preparation, that step does not wait on another contractor.
Yes. Hand-form crews build ADA curb ramps at corners and mid-block crossings. Slopes are set to the ratios on the plans, such as 1:12 for the ramp run. Ramps can be poured in the same visit as the curb and sidewalk.
U.S. Census Bureau: QuickFacts, Groves city, Texas
Port Arthur News: See which roads made the cut in Groves road improvement, replacement schedule
Port Arthur News: Monroe Street part of multi-year Groves improvement project
Port Arthur News: Oak Avenue sees upgrade: Weather prompts Groves road to receive attention
Jefferson County Drainage District #7: Introduction
Jefferson County Drainage District #7: District Projects
Port Arthur News: Better know a (Drainage) District
Salisbury Post: Despite Harvey's historic rainfall, drainage district's operations draw questions